VOLTAELECTRICAL ESTIMATING
Bid Total
$0
— margin

Upload a drawing set.
Get an estimate back.

Drop your electrical tender PDF. VOLTA reads the sheet list, legend and schedules, drafts quantities and BC pricing, and writes an AI summary of every section.

Drop PDF here or tap to browse
Multi-page blueprint sets welcome. Stays on your device — nothing is uploaded.

AI produces a first-pass draft — a starting point, not gospel. Review every quantity against the plans before you bid; one number off can cost thousands.

Project overview

no drawings
Systems detected
Bid price · pre-tax
$0
client total —
Your cost
$0
incl. overhead
Gross profit
$0
0% margin
Material
$0
Labour hours
0
— h/day
Contingency
$0
buffer held
Client total
$0
incl. GST
Schedule
adjust crew & hours in Quick Tune
Crew size
0
people on site
Duration
calendar days
Cost vs revenue
Cost by division

Quick tune

drag — the bid updates live

Building structure & labour conditions

×1.00 labour
Structure — master toggle (applies NECA labour factor to every hour)
AI · Overview
Upload a PDF or enter quantities to generate an overview.
AI · Scope
Upload a PDF or enter quantities to summarize scope.
AI · The numbers
Generate an estimate to see financial analysis.

Takeoff

AI drafts the quantities; you refine. Every figure is editable and feeds the price instantly.

0 items counted
— / — Reference view — zoom into dense areas.
AI · Takeoff notes
Add quantities to see takeoff analysis.

Pricing cockpit

Defaults are Lower-Mainland BC. Slide the rates to match your shop — the whole bid recalculates live.

Rates & markups

Unit prices

slide or type · ↺ resets to BC recommended

BC Standards — Lower Mainland reference

2024–2025 typical
Labour (union / non-union)
Journeyman billed: $105–$135/h
Journeyman cost: $58–$78/h
Apprentice (2nd–3rd yr): $38–$52/h billed
Foreman premium: +15–20%
Markups & overhead
Material markup: 18–25%
Overhead: 10–14% (small shop)
Overhead: 14–18% (mid-size shop)
Contingency: 8–12% (design-bid), 12–18% (design-build)
Waste & misc
Wire waste: 5–8%
Conduit waste: 8–12%
Device / fixture damage: 3–5%
Cartage / small tools: 2–3% of material
Taxes (BC real property)
GST: 5% on total contract
PST on materials: 7% (real property work)
PST exempt: labour-only portions
Verify with your accountant — rules change
These are Metro Vancouver norms for commercial / multi-res electrical. Adjust for remote sites, high-rise, or prevailing-wage projects. Always confirm current ECA / NECA wage schedules and WorkSafeBC rates.
AI · Pricing
Add quantities to see pricing analysis.

Quote

A clean, client-ready quotation. Print or save to PDF.

AI · Cover note
Add quantities to draft a cover note.

Settings

Crew, taxes, project costs and company details.

Crew & schedule

$

Taxes

Confirm with your accountant

Company details

Project data

VOLTA · figures are planning estimates — verify before bidding.