How to calculate markup on electrical estimates (Canada, 2026)
Markup is the percentage you add to your direct job cost; margin is the share of the selling price you keep. To hit a target margin, divide your direct cost by (1 − margin): a 30% margin needs a 42.9% markup, not 30%. Work out the margin you need from your own overhead and profit target, convert it to markup, and add GST, HST or PST on top of the price, never inside it.
Figures below come from the sources linked inline and listed under Sources, checked on November 16, 2026. VOLTA makes one of the products mentioned.
- Markup is calculated on cost; margin is calculated on price. The same dollars give two different percentages.
- Price = direct cost ÷ (1 − target margin). Markup = price ÷ direct cost − 1.
- Your target margin is your overhead rate plus your profit target, both as a share of revenue, taken from your own books.
- Statistics Canada data for small Canadian electrical contractors shows an average gross margin of 45.1% and net profit of 11.9% in 2024, but averages hide a wide spread between residential service and commercial bid work.
- Sales tax is not markup. In BC the contractor pays 7% PST on installed materials as a cost, and GST is added to the price. Ontario and the Atlantic provinces charge HST on the price.
What is the difference between markup and margin?
Markup is measured against cost. Margin is measured against the selling price. If a job costs you $7,000 and you sell it for $10,000, the $3,000 difference is a 42.9% markup ($3,000 ÷ $7,000) and a 30% margin ($3,000 ÷ $10,000). Same money, two percentages.
Canadian Contractor’s business-coaching column on the subject uses exactly that relationship: on $500,000 of revenue with $350,000 of direct job costs, the gross margin is 30% and the markup needed to produce it is 43% (Canadian Contractor). The column’s point is the one that costs electrical shops money: if your overhead and profit are expressed as a share of revenue, you have to convert them before you add them to cost.
The conversion is fixed arithmetic, so it is worth keeping on the wall:
| Target margin (share of price) | Markup on direct cost needed |
|---|---|
| 20% | 25.0% |
| 25% | 33.3% |
| 30% | 42.9% |
| 35% | 53.8% |
| 45% | 81.8% |
| 50% | 100.0% |
| 55% | 122.2% |
How do you calculate markup on an electrical estimate?
Three steps, in this order.
- Total the direct job cost. Material at what you actually pay (including any PST you pay as the contractor), labour hours × your loaded cost rate, permit fees, equipment rental, subcontractors and disposal. Everything that exists only because this job exists. Our labour units guide covers how hours become dollars without mixing up wage and cost rate.
- Set the target margin. Overhead rate + profit target, both as a percentage of revenue. If last year’s overhead was 20% of revenue and you want 10% profit, your target margin is 30%.
- Price the job. Price = direct cost ÷ (1 − target margin). The markup you just applied is price ÷ direct cost − 1.
The shortcut most spreadsheets use, cost + 20% overhead + 10% profit, applies those percentages to cost instead of price. Canadian Contractor’s column shows the gap on its own example: the shortcut prices $350,000 of cost at $455,000 instead of $500,000, leaving $45,000 short (Canadian Contractor).
A worked example in CAD
A residential renovation in a BC municipality served by Technical Safety BC. The inputs are illustrative; swap in your own supplier pricing, hours and rates.
| Line | Calculation | Amount (CAD) |
|---|---|---|
| Material, supplier price | from the takeoff | $3,500.00 |
| BC PST paid by the contractor on that material | 7% × $3,500 | $245.00 |
| Labour | 36 h × $52/h loaded cost rate | $1,872.00 |
| Electrical permit | Technical Safety BC, job value $5,001 to $10,000 band, 2026 | $515.00 |
| Direct job cost | $6,132.00 | |
| Price at a 30% target margin | $6,132 ÷ (1 − 0.30) | $8,760.00 |
| Markup actually applied | $8,760 ÷ $6,132 − 1 | 42.9% |
| GST on the price | 5% × $8,760 | $438.00 |
| Total to the client | $9,198.00 |
The $52 loaded cost rate is an assumption for the example: Job Bank puts the BC median wage for a journeyperson electrician at $34.00 an hour (Job Bank), and a Canadian accounting firm that works with electrical contractors puts the fully burdened cost of an electrician at 40% to 55% above base wages (Tangent Consulting). $34.00 × 1.53 ≈ $52. Use your own payroll numbers.
The permit line comes from the Technical Safety BC 2026 electrical fee schedule, where contractor permits for this kind of work are banded by the total price paid by the client excluding GST. An $8,760 price sits in the $5,001 to $10,000 band, which is $515 in 2026. If the site is in Vancouver, Burnaby, Surrey or another municipality that runs its own electrical permits, the number changes; see what an electrical permit costs in BC.
Now the common mistake. Apply “30% markup” to the same $6,132 and the price is $7,971.60. That is a 23.1% margin, not 30%, and the job is $788.40 short of what the overhead and profit plan needed. On a year of jobs like this, that gap is the difference between the profit you planned and the profit you got.
What markup do electrical contractors use in Canada?
There is no single industry markup, and anyone quoting one is quoting their own shop. What is published are margins, and they vary a lot by the kind of work.
| Source | What it measures | Figure |
|---|---|---|
| Statistics Canada via ISED, NAICS 23821, 2024 | Electrical contractors with $30,000 to $5,000,000 revenue, all of Canada: average gross margin | 45.1% |
| Same | Average net profit, as a share of revenue | 11.9% |
| Same | Average net profit of the lower-middle and upper-middle quartiles | 6.6% and 18.6% |
| Tangent Consulting, June 2026 | Gross margin on residential service calls | 45% to 55% |
| Same | Gross margin on competitive commercial bid work | 20% to 30% |
| Same | Median net margin, electrical contractors | 5% to 6% (top quartile 10% to 12%) |
| Canadian Contractor, 2019 | Profit objective for a construction company | 8% minimum, 10% average, 15% well run |
Two cautions before you use any of these. First, definitions differ: Statistics Canada’s cost of sales includes wages, materials and subcontracts, so its gross margin is not the same thing as your job-cost margin if you load overhead differently. Second, these are outcomes, not targets. The margin you need comes from your own overhead and profit plan; the table tells you whether that plan is in a believable range for the work you do.
Read through the conversion table above, residential service margins of 45% to 55% mean markups of roughly 82% to 122% on direct cost, and commercial bid margins of 20% to 30% mean markups of 25% to about 43%. That spread is why one shop-wide markup rarely fits both kinds of work. If you price residential work by the device instead, price per point and flat-rate estimating covers how markup hides inside the unit price.
How do you work out your overhead rate?
From last year’s books, not from a rule of thumb. Add up every cost that does not belong to a single job: office and estimating time, the owner’s salary, trucks not charged to jobs, insurance, licences, software, rent, accounting, advertising and small tools. Divide by last year’s revenue. That is your overhead rate.
Two figures help you sanity-check it. Tangent Consulting puts healthy overhead for a $1M to $5M electrical contractor at around 20% to 28% of revenue, and calls anything above 35% a red flag (Tangent Consulting). Statistics Canada’s 2024 data for small electrical contractors shows operating (indirect) expenses averaging 33.2% of revenue, though that line includes some labour the survey classes as indirect (ISED).
Licence fees, the annual insurance bill and your estimating software belong here, spread across all jobs, not added to one bid. Permits and job-specific inspection fees belong in direct cost, on their own line.
Where do GST, PST and HST go on an electrical quote?
Never inside the markup. Tax either sits in your cost (where you pay it as the end user) or on top of the price (where you collect it), and the province decides which.
| Province | Rate on the quote, per the CRA | What changes for the estimate |
|---|---|---|
| British Columbia | 5% GST on the price | You pay 7% PST on taxable goods you install as a real property contractor, and you do not charge PST to the customer. Put the PST in material cost before markup. |
| Alberta | 5% GST | No provincial sales tax. |
| Ontario | 13% HST | HST on the price; no separate PST line. |
| Saskatchewan / Manitoba | 5% GST + 6% / 7% PST listed by the CRA | Check the province’s own contractor rules for how PST applies to installed materials. |
| Quebec | 5% GST + 9.975% QST listed by the CRA | Check Revenu Québec’s rules for construction contracts. |
| Nova Scotia | 14% HST since April 1, 2025 | HST on the price. |
| New Brunswick, Newfoundland and Labrador, PEI | 15% HST | HST on the price. |
Rates are from the Canada Revenue Agency’s GST/HST rates table. The BC rule is from the province: a real property contractor “must pay PST on taxable goods you obtain to fulfill a contract, unless a specific exemption applies. You do not charge your customers PST” (Government of BC). A BC template carried into Alberta or Ontario usually double-counts tax, so switch it off before you price. The province guides for Ontario and Alberta cover the rest of what a quote carries there.
How does VOLTA handle markup?
VOLTA keeps cost and price apart on purpose. You set bill rate, cost rate, markup, waste, overhead and contingency as separate inputs in the pricing cockpit, and the calculation report shows the arithmetic behind every line, so you can check that the markup you typed produces the margin you meant. Provincial tax is a setting, not a hidden number: BC PST on materials can be switched on or off, and GST or HST goes on the quote. The takeoff that feeds it is drafted from your PDF in the browser (PDF takeoff), and you review every quantity before it prices. It is $9.99 CAD a month after a 30-day free trial; see pricing.
Frequently asked questions
What is the difference between markup and margin on an electrical estimate?
How do I convert a target margin into a markup?
What is a typical profit margin for an electrical contractor in Canada?
Should overhead be included in the markup or as a line item?
Do I charge PST on electrical work in BC?
Sources
Each source was opened and checked on November 16, 2026.
- Canadian Contractor, Business coaching: Markup, margin and all that stuff (November 3, 2019)
- Innovation, Science and Economic Development Canada (Statistics Canada data), Financial performance: Electrical contractors, NAICS 23821, 2024
- Tangent Consulting, The hidden costs threatening electrical contractor margins (June 12, 2026)
- Technical Safety BC, Fee schedule: Electrical (2026 and 2027)
- Government of Canada, Job Bank, Wages: Electrician in British Columbia
- Canada Revenue Agency, GST/HST calculator (and rates)
- Government of British Columbia, Provincial sales tax frequently asked questions